Project Details

300kW EVI DC Inverter Heat Pump System

LOCATION

Hotel Asal Riverside, Laddi Pahalgam, Jammu & Kashmir

PROJECT TYPE

Completed

DATE

Jan 26, 2026

Project Head

POWER WORLD CLIMATE TEAM

Power World Climate Project: 300kW EVI DC Inverter Heat Pump System Installation

Project Overview

POWER WORLD CLIMATE successfully completed the installation and commissioning of a 300kW EVI DC Inverter Heat Pump System at Hotel Asal Riverside, Laddi Pahalgam, Jammu & Kashmir. The project was designed for centralized heating, cooling, and domestic hot water requirements for a 50-room hotel property.\r\nThe system includes advanced EVI DC Inverter technology with indoor and outdoor units, ensuring high efficiency, energy savings, stable temperature control, and reliable performance in extreme cold climate conditions. The project also features a complete VRF system and centralized hot water solution for guest comfort and continuous operation.\r\nOur team handled complete supply, installation, testing, and commissioning with professional technical support and after-sales service. The client is highly satisfied with the system performance, comfort level, and service quality provided by POWER WORLD CLIMATE.\r\nServices Included:\r\nCentralized Heating System\r\nCooling System\r\nDomestic Hot Water System\r\nEVI DC Inverter Technology\r\nHeat pump Indoor & Outdoor Units\r\nComplete Installation & Commissioning\r\nProfessional After Sales Support\r\npwclimate.com